Skip to content

Design & engineering · Architecture & Planning

Approval (Sanction) Drawings

Approval drawings prepared to your local authority's requirements, with support through the submission and any queries raised on the drawings.

A clearly dimensioned, colour-coded architectural floor plan laid flat with a spirit level, a second plan and a hard hatIllustration

Suited for

  • New houses needing building permission
  • Commercial buildings
  • Adding a floor to an existing building
  • Revised plans after a design change

Overview

Approval (Sanction) Drawings by BHK99

Before construction starts, most buildings need drawings approved by the municipal body, development authority or panchayat that governs the plot. These drawings show the site plan, setbacks, areas, floor plans, sections and elevations in the format the authority asks for. We prepare that set from your design, check it against the applicable rules, and help you assemble it with the documents the authority requires.

The authority decides on the approval and sets its own timeline; we cannot decide the outcome or speed it up. What we can do is make the drawings clear and complete, and respond promptly if the authority raises a query on them.

What's included

  • Review of plot documents and applicable building rules
  • Site plan with setbacks and road widths
  • Area statement for each floor
  • Floor plans, sections and elevations in the required format
  • Checklist of documents needed from you
  • Revisions in response to authority queries on the drawings
  • Support with the submission process

Our approach

What we pay attention to

  • Rules checked before drawing

    Setbacks, height and area limits are checked at concept stage, so the design you like is one that can be submitted.

  • Clear area statements

    Built-up and floor areas are calculated and presented in the format the authority expects.

  • One design, two sets

    Sanction drawings follow your chosen design, and the working drawings for site then follow the sanctioned layout.

Step by step

How the work proceeds

  1. 1

    Brief & site study

    We walk your plot and talk through how you live or work, your budget and your priorities, before sketching anything.

  2. 2

    Concept design & space planning

    Room sizes, placement and circulation are worked out to fit your plot, orientation and brief.

  3. 3

    2D floor plans

    Detailed floor plans for every level, showing room dimensions and positions.

  4. 4

    3D elevation design

    A 3D view of the front and sides of the building, so you can see and approve the look before construction starts.

  5. 5

    Working drawings

    Construction-ready drawings — the set your site team and contractor actually build from.

  6. 6

    Design support during execution

    We stay available to clarify the drawings as construction proceeds.

Typical timeline

Indicative durations for a typical independent house or small commercial building. The actual schedule depends on scope and on how quickly decisions are made, and is agreed in writing before work starts.

  • Brief & site study1–2 weeks
  • Concept & space planning2–4 weeks
  • Elevation & design development2–4 weeks
  • Working & approval drawings3–6 weeks
  • Approval & construction supportas agreed

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Approval (Sanction) Drawings: common questions

How long does approval take?

That depends on the authority and its workload. We prepare the drawings promptly, but the authority sets its own timeline.

Can construction start before approval?

We advise waiting. Building without approval can lead to notices, penalties or demolition orders, depending on local rules.

What documents will I need?

Usually ownership papers, a recent tax receipt, identity proof and a plot map. The exact list depends on the authority; we share it at the start.

How are construction payments planned?

The payment plan is discussed with the project scope and written quotation. It should relate to clear stages of work, so you understand what has been completed before each payment is due.

How will I see the work happening at site?

Your project team shares regular site updates. For active projects, the BHK99 client portal is designed to bring approved updates, photos, milestones and documents together in one place.