Skip to content

Construction

Renovation construction

Floor additions, structural repairs, remodelling and modernisation — assessed by engineers first, so changes are safe for the existing structure.

Workers repairing and painting the front of an Indian houseIllustrative photo

What's included

  • Structural condition assessment
  • Floor additions and extensions
  • Repairs, waterproofing and strengthening
  • Kitchen, bathroom and façade upgrades
  • Supervised execution with minimal disruption

Overview

Renovation construction with BHK99

Renovating an existing building is different from building new, because the structure is already there and you have to work with what it can carry. BHK99 starts every renovation, extension or repair in Chhindwara, Seoni and Nagpur with an engineer's assessment of the existing building: its foundation, columns, beams, slabs and walls, any cracks or damp, and the drawings if they exist. Only then do we propose what can safely be added, removed or changed.

The work itself is planned to protect the people and property around it. For occupied homes and running shops, we sequence demolition and noisy work, keep access and services available where possible, contain dust and debris, and support the structure properly whenever an opening is made or a wall is altered. New work is tied into old with details designed for that specific building.

Materials and specifications follow the structural design for the work and the package agreed in writing. You receive regular progress updates and site photographs, and shared progress and documents can be viewed in the BHK99 client portal. At handover, the drawings are updated to show what was changed, so the next person who works on the building knows what is there.

Who it's for

  • Families adding space

    Owners who need another floor or room for a growing family and want to know first whether the existing house can take it.

  • Owners of older buildings

    Homes and shops with cracks, leaks, damp or corroded reinforcement that need a proper diagnosis before repair.

  • Owners updating tired spaces

    Families remodelling a kitchen, bathroom or façade, who want new finishes without hidden problems underneath.

  • Shop and office owners

    Businesses refitting or extending premises while trying to keep disruption to customers and staff low.

Scope of work

  • Structural condition assessment
  • Floor additions and extensions
  • Repairs, waterproofing and strengthening
  • Kitchen, bathroom and façade upgrades
  • Supervised execution with minimal disruption

Suited for

  • Adding a floor
  • Older homes needing repair
  • Shop and office refits

Every project is quoted after we understand your site and requirements. Share a few details and our team will call you.

City-wise rates →Cost calculator →

Step by step

How we deliver this construction

  1. 1

    Structural condition assessment

    An engineer assesses the existing structure first — what it can safely carry, and what it cannot — before anything is proposed.

  2. 2

    Scope finalisation

    Based on the assessment, we agree exactly what can be added, extended or changed safely.

  3. 3

    Design for the addition or repair

    Drawings are prepared for the specific work — a floor addition, a repair, or a remodel — matched to the existing structure.

  4. 4

    Execution with minimal disruption

    Work is sequenced to keep the rest of the building usable wherever possible, especially for occupied homes and shops.

  5. 5

    Final check & handover

    A final inspection against the design, then handover with updated documentation.

What you receive

  • A written structural assessment before work begins
  • Drawings for the addition, extension or repair
  • Execution that protects your existing structure
  • Updated documentation at handover

Materials & quality

Materials & quality approach

Renovation quality depends on how new work meets old. Materials and specifications come from the structural design for the work and the package agreed in writing; on site we concentrate on assessment, safe support of the existing structure and careful joining of new to old.

  • Assessment first

    An engineer assesses the existing structure, and the findings are written down before any work is proposed or priced.

  • Specifications from design and package

    Repair materials, waterproofing systems, finishes and fittings follow the design for the work and the written package, chosen to suit the existing building.

  • Safe support during work

    Before walls are opened, members repaired or slabs altered, the structure is propped and supported as the design requires.

  • Joining new to old

    Surfaces are prepared, reinforcement is connected as detailed and new concrete is cured properly, so new work bonds with the existing structure.

  • Waterproofing and services

    Wet areas and roofs are waterproofed and water-tested; renewed plumbing is pressure-tested and wiring checked before finishes are restored.

  • Inspections and updated records

    Each stage is inspected before it is covered, and the drawings are updated at handover to show what was changed.

Typical timeline

These durations are indicative and vary widely, because every existing building is different. Actual time depends on the scope, what the assessment finds, approvals for structural changes or additions, whether the building stays occupied, and site conditions. The schedule is agreed in writing before work starts, and the completion date is an estimate updated as work proceeds, especially once hidden conditions are opened up.

  1. Assessment & scope

    Site inspection, structural assessment, tests where needed and agreement on the scope.

    1–3 weeks

  2. Design & approvals

    Drawings for the repair, remodel or addition; sanction is decided by the authority where it is required.

    2–6 weeks

  3. Preparation & demolition

    Protection of occupied areas, propping where needed and careful removal of old work.

    1–3 weeks

  4. Repair, structure & services

    Structural repair or new structure, plumbing, wiring and waterproofing. A floor addition takes longer, per floor.

    3–8 weeks

  5. Finishing & handover

    Tiling, plaster, paint and fittings, final inspection and updated drawings.

    2–6 weeks

Indicative ranges only. Your project's schedule is agreed in writing once the design and scope are final.

What changes the duration

  • Size and type of work: repair, remodel or floor addition
  • Condition found once old finishes are removed
  • Approvals for structural changes or additional floors
  • Whether the building stays occupied during work
  • Access, storage space and working hours on the site
  • Matching or sourcing finishes for existing areas

Projects

Renovation projects

All projects

Project photos are on their way

We publish a project only with genuine site photographs and details the owner has confirmed. Ask our team about similar work, or request a visit to an ongoing site.

Request a site visit

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Questions we often hear

Why do you assess the building before quoting?

Because the existing structure decides what is safe and what the work involves. Without an assessment, a quote is a guess, and surprises appear once walls and floors are opened. The assessment gives both of us a written starting point for the scope, and it may show problems that should be fixed before anything is added.

Can I stay in my home during the renovation?

In many cases, yes. We plan the work in sections, keep access and essential services available where possible, contain dust and debris, and tell you in advance about noisy days or times when an area is unsafe. For major structural work or a full remodel, moving out for part of the time may be more practical.

Do I need approval for renovation work?

Floor additions, extensions and structural changes usually need approval from the local authority, while repairs and internal remodelling often do not. The rules differ by area. We prepare drawings and support submissions where approval is needed; the authority makes the decision.

Can a load-bearing wall be removed?

Sometimes, but only with a structural design for what will carry the load instead, such as a beam and columns, and with temporary support during the work. Removing a wall without that can endanger the building. Our engineer checks whether a wall is load-bearing before anything is proposed.

Will new finishes match the existing ones?

We try to match or complement existing tiles, plaster textures and paint, but older materials are sometimes no longer available. Where an exact match is not possible, we show you options before ordering, and suggest where a deliberate change of finish looks better than a near-match.

What happens if hidden problems are found during work?

Old buildings often reveal concealed damage, such as corroded reinforcement or failed pipes, once finishes are removed. We stop, show you what was found with photographs, explain the options and their effect on cost and time, and record your decision in writing before continuing.

How do you handle debris and dust?

Work areas are screened, debris is bagged and removed regularly rather than left to pile up, and neighbouring areas are protected. Disposal is arranged in line with local rules. We agree working hours with you, and with neighbours where the work affects them.