Construction · Renovation

Kitchen, Bathroom & Façade Remodelling

Remodelling of kitchens, bathrooms and façades that renews the plumbing, wiring and waterproofing behind the finishes, not only the surfaces you see.

Close-up of floor tiles being laid with levelling clipsIllustrative photo

Suited for

  • Old kitchens and bathrooms
  • Homes being modernised
  • Shops updating their frontage
  • Buildings with dated elevations

Overview

Kitchen, Bathroom & Façade Remodelling by BHK99

A kitchen or bathroom remodel is the right time to replace old pipes, add electrical points and redo waterproofing, because the walls and floor are already open. We plan the new layout first, then the services behind it, so you do not end up with new tiles over old problems.

Façade remodelling can modernise a building's front with new elevation features, cladding, windows or paint. Any new projections or heavy cladding are checked by the structural engineer and fixed with proper details. Work is sequenced to keep the rest of the home or shop usable wherever possible.

What's included

  • Layout planning for the new kitchen, bathroom or façade
  • Removal of old finishes with protection for the rest of the building
  • Renewal of plumbing, drainage and electrical points
  • Waterproofing of wet areas and water testing
  • Tiling, fittings and finishes as per the agreed package
  • Façade elements, cladding and windows with structural checks
  • Clean-up and handover with details of what was installed

Our approach

What we pay attention to

  • Services renewed

    Old pipes and wiring behind the walls are replaced while they are accessible, rather than left behind new tiles.

  • Waterproofing redone

    Bathroom and kitchen floors are re-waterproofed and tested before the new finishes go down.

  • Façades fixed properly

    New cladding and projections are checked for weight and fixed with designed details.

Step by step

How the work proceeds

  1. 1

    Structural condition assessment

    An engineer assesses the existing structure first — what it can safely carry, and what it cannot — before anything is proposed.

  2. 2

    Scope finalisation

    Based on the assessment, we agree exactly what can be added, extended or changed safely.

  3. 3

    Design for the addition or repair

    Drawings are prepared for the specific work — a floor addition, a repair, or a remodel — matched to the existing structure.

  4. 4

    Execution with minimal disruption

    Work is sequenced to keep the rest of the building usable wherever possible, especially for occupied homes and shops.

  5. 5

    Final check & handover

    A final inspection against the design, then handover with updated documentation.

Typical timeline

These durations are indicative and vary widely, because every existing building is different. Actual time depends on the scope, what the assessment finds, approvals for structural changes or additions, whether the building stays occupied, and site conditions. The schedule is agreed in writing before work starts, and the completion date is an estimate updated as work proceeds, especially once hidden conditions are opened up.

  • Assessment & scope1–3 weeks
  • Design & approvals2–6 weeks
  • Preparation & demolition1–3 weeks
  • Repair, structure & services3–8 weeks
  • Finishing & handover2–6 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Projects

Kitchen, Bathroom & Façade Remodelling: projects

All projects

Project photos are on their way

We publish a project only with genuine site photographs and details the owner has confirmed. Ask our team about similar work, or request a visit to an ongoing site.

Request a site visit

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Kitchen, Bathroom & Façade Remodelling: common questions

Can we use the house while the kitchen is being remodelled?

Usually, yes. We discuss a temporary cooking arrangement with you and contain dust and debris to the work area.

Can a bathroom be moved to a different place?

Sometimes. It depends on drainage slopes, the structure below and access to the main drain, which we check before planning.

Can a new elevation be added to an old building?

Often, yes, after the structural engineer checks the walls and frame. Lightweight elements are preferred where the existing structure has limited capacity.