A commercial building has to work hard for its owner. Shops need frontage and footfall, offices need light, ventilation and flexible floors, and every building needs services that can carry the loads the business will put on them. BHK99 plans and builds shops, showrooms, offices, mixed-use buildings and institutional buildings in Chhindwara, Seoni and Nagpur, with one team responsible for design coordination, structure and construction.
We start with how the building will be used: who comes in, how goods are delivered, where parking and signage go, and whether you will occupy it or let it out. That shapes the column grid, floor heights, staircase and lift positions, and the electrical and plumbing capacity, so the finished shell suits your fit-out, or your tenant's, without breaking open new work.
Commercial projects are often tied to a business plan, so the schedule is agreed in writing and progress is reported regularly with site photographs, with shared documents available in the BHK99 client portal. Materials and specifications follow the structural design and the package agreed in writing. Fire, parking and other statutory requirements are accounted for in the drawings that go to the authority, which makes the final decision.
Who it's for
Business owners building their own premises
Traders, shop owners and professionals who want a building planned around their own operations, with room to grow.
Owners building to let
Investors planning shops or offices for rent, who need flexible floor plates and separate services so each unit can be leased on its own.
Institutions and trusts
Clinics, schools, coaching centres and trusts that need buildings planned for daily public use, safe circulation and the requirements of their regulator.
Mixed-use owners
Families building shops at street level with homes or offices above, who need the two uses to work side by side without getting in each other's way.
What we offer
Commercial services
Each has its own page with scope, approach and answers to common questions.
We study footfall, frontage visibility and how the space will actually run before planning begins.
2
Layout, structure & façade design
Space planning, structural design and the street-facing façade are designed together, not bolted on afterwards.
3
Approval-ready drawings
Drawings are prepared for statutory submission, with services (electrical, water, fire as applicable) accounted for at the design stage.
4
Construction with services coordination
Civil work and building services are sequenced together so conduits, ducting and fittings land where the design intended.
5
Fit-out readiness check
Before handover we confirm the shell is ready for your fit-out or tenant's fit-out, with no rework needed.
6
Handover
Documentation and a joint walk-through before you take possession.
What you receive
Space planning and façade drawings
Structural and services-coordination drawings
Construction progress reports
Completion documentation at handover
A fit-out-ready shell
Materials & quality
Materials & quality approach
Commercial buildings see heavier use, larger spans and more services than homes. The structural design and the agreed package set the materials and specifications; on site we concentrate on getting the frame, the services and the façade right before they are covered up.
Specifications from design and package
Cement, steel, blockwork, glazing and fittings are as specified in the structural drawings and the written package. Any change is agreed in writing before materials are ordered.
Larger spans, stricter checks
Wider column spacing and longer beams mean more reinforcement. Bar placement, laps, cover and formwork are checked against the drawings before each pour.
Concrete practice
Concrete is mixed and placed to the design, compacted properly and cured for the period the relevant Indian Standard codes call for, with test cubes taken where the design or the agreement requires them.
Services planned for commercial loads
Electrical capacity, distribution boards, earthing, water storage and drainage are laid out for the building's use, with sleeves and shafts left before slabs are cast.
Façade and frontage
Fixing details for glazing, cladding and signage are coordinated with the structure, and joints around openings are sealed and waterproofed.
Stage inspections and fit-out check
Each stage is inspected before the next begins, and the shell is checked against your fit-out or your tenant's requirements before handover.
Typical timeline
These durations are indicative for a typical low-rise commercial building. Actual time depends on the size and complexity of the building, approvals including any fire or land-use requirements, site conditions and the scope of services. The schedule is agreed in writing before work starts, and the handover date is always an estimate kept up to date as work proceeds.
Brief, planning & design
Usage study, layout, façade, structural and services design, with your review at each step.
4–8 weeks
Approvals
Drawings are prepared and submitted with you; the authority decides the sanction and any fire or other approvals that apply.
As per the authority's process
Foundation & plinth
Excavation, footings and plinth, depending on soil, building size and neighbouring structures.
4–8 weeks
Structure
Columns, beams and slabs for each floor, with sleeves and openings left for services.
4–8 weeks per floor
Masonry, services & façade
Walls, electrical and plumbing work, shafts, plastering, glazing and façade elements.
8–14 weeks
Finishing & fit-out readiness
Flooring, finishes in common areas, testing of services and a final check against your fit-out needs.
6–10 weeks
Indicative ranges only. Your project's schedule is agreed in writing once the design and scope are final.
What changes the duration
Building size, height and spans
Fire, parking and land-use requirements for approval
Soil conditions and the foundation they need
Services such as lifts, power backup or air-conditioning
Lead times for façade glazing and special materials
Restricted working or delivery hours in busy market areas
How long does a commercial building take to build?
It depends on the building's size, height, services and approvals. The indicative phases above show how the work is usually divided, but we set your schedule only after the design is fixed and the site is studied. The schedule is agreed in writing, and the handover date is an estimate that we update as the work proceeds.
Does my building need a fire approval?
That depends on the building's height, area and use, and on the local rules. Where fire requirements apply, we account for them in the drawings, including escape routes, staircases and space for fire-fighting equipment, and support you through the submission. The fire authority decides the approval.
Can you build a bare shell for my tenant's fit-out?
Yes. Many commercial owners prefer to hand over a shell and let the tenant fit out their own space. We agree the shell scope with you in writing, including floors, walls, services up to agreed points and common areas, and check it against the tenant's requirements where you share them.
Can you work in a crowded market area?
Yes. We plan material deliveries, storage and working hours around the neighbourhood and any local restrictions, and protect adjoining buildings, the footpath and the road during excavation and concreting. Neighbours are informed before noisy or disruptive work wherever that is practical.
How do you avoid clashes between structure and services?
Electrical, plumbing, drainage and any air-conditioning routes are drawn with the structure before construction starts. Sleeves, shafts and openings are fixed in place before each slab is cast, so services do not need to be cut through finished concrete later.
Who decides the materials and specifications?
The structural design sets the structural materials and grades, and the package agreed in writing sets finishes, fittings and brands. We do not substitute items on our own. If a change is needed, for example because a specified item is unavailable, we explain the options and record your decision in writing.
Can the building be designed for a lift or extra floors later?
Yes, if you tell us at the start. The structural engineer designs the foundation and frame for the future loads, and a lift shaft and pit can be left in place. Planning for this later is much harder once the frame is built.
Will I receive a detailed quotation before work begins?
Yes. Before you commit, we discuss the proposed scope and materials, then prepare a written quotation. Ask questions about what is included, excluded and when each stage is planned.
Can BHK99 handle my project from design to handover?
Yes. Our turnkey service can bring architecture, structural planning, construction, interiors and handover under one coordinated team, with one point of contact for the project.