Uday Public School – New Block
A new G+3 school block on the existing Uday Public School campus in Seoni: a 25 m hall on the ground floor, four classrooms on each upper floor, wide galleries, a lift and separate toilet blocks. Under construction by BHK99.
- Configuration
- G+3 school block · 12 classrooms
The new block at Uday Public School, Seoni, is a four-storey (G+3) building added to the existing campus, under construction by BHK99. It connects to the school through wide galleries, with a 3.3 m entrance gallery and 1.5 m and 1.8 m galleries linking the new and old buildings.
The ground floor holds a 25 m × 10.54 m hall for assemblies and events, a store room, staff toilets and a large boys' toilet block. Each of the three upper floors has four 6 m × 10.5 m classrooms along a 1.8 m gallery, with boys' toilets on the first floor and separate girls' and boys' toilets on the second and third floors. A lift and a staircase serve every floor.
Work began in December 2025 with column footings dug and poured alongside the existing building. By October 2026 the RCC frame had reached the top floor, with brick walls going up and the roof slab shuttering in place.
Scope of work
- Architecture and planning
- Structural design
- Construction
Specifications
- Building
- G+3 school block on an existing campus
- Ground floor
- 25 m × 10.54 m hall, store room, staff toilets and boys' toilet block
- Classrooms
- 4 per floor on the first, second and third floors, each 6 m × 10.5 m
- Toilets
- Boys' and girls' toilet blocks
- Circulation
- Lift, staircase and 1.5–3.3 m wide galleries
- Structure
- RCC frame with brick infill
- Progress
- Footings in December 2025; frame up to the top floor by October 2026
Drawings
Plans & drawings
Tap a drawing to view it full screen.
Planning something similar?
Tell us about your construction requirements and our team will get in touch.
Our Locations
We serve key locations with a local, on-ground approach.