One contract from design to keys. We coordinate architecture, approvals support, structure, construction, interiors and handover so you deal with a single team.
Drawings for statutory approval (submission support)
Construction with material management
Interior and finishing works
Daily progress reporting
Overview
Turnkey construction with BHK99
Turnkey construction means one contract and one team from the first design conversation to the day you receive the keys. BHK99 coordinates architecture, structural design, drawings for approval, construction, finishing and, where you choose, interiors, so you do not have to manage separate consultants and contractors or settle disputes between them. This suits owners in Chhindwara, Seoni and Nagpur who want clear responsibility, and owners who cannot be on site often.
The scope is what makes turnkey work. Before construction starts, we agree in writing what is included and what is not: design deliverables, structure, finishes, fittings, services, interiors, external works such as a compound wall or gate, and items you will supply yourself. Materials, brands and grades follow the structural design and the package in that agreement, so there is one reference for every decision.
Once the scope is agreed, a single schedule covers design, construction and finishing. You have one point of contact, receive regular progress updates and site photographs, and can view shared progress and documents in the BHK99 client portal. Any change you request is priced, its effect on time explained, and recorded in writing before it is carried out, so the scope and the final handover stay clear.
Who it's for
Owners who want one point of contact
If you would rather not coordinate an architect, an engineer, a contractor and an interior team yourself, turnkey puts them under one agreement.
Busy professionals and business owners
People with limited time for site visits who still want to take the key decisions on design, finishes and budget.
NRI and out-of-town owners
Owners living elsewhere who need regular, honest reporting and a team that can act on their behalf day to day.
Time-bound projects
Homes or business premises needed by a particular time, where one schedule across design and construction helps avoid gaps between separate contracts.
What we offer
Turnkey services
Each has its own page with scope, approach and answers to common questions.
One conversation covers design, budget and timeline — you don't repeat your brief to separate architecture, structure and execution teams.
2
Architecture & structural design, in parallel
Our architects and structural engineers design together from the start, so nothing has to be redesigned later for a clash.
3
Approvals submission support
One consolidated drawing set is prepared for statutory sanction.
4
Construction, interiors & finishing on one schedule
Civil work, services, interiors and finishing are sequenced under a single project schedule, not separate contracts.
5
Daily progress reporting
One point of contact keeps you updated — you are not chasing different vendors for different parts of the build.
6
Documented handover
A single, complete handover — drawings, documentation and keys — once everything is ready.
What you receive
One consolidated drawing set (architecture + structure)
A single project schedule covering design to handover
Regular progress reports to one point of contact
Interior and finishing execution
Complete handover documentation
Materials & quality
Materials & quality approach
In a turnkey project, quality is one team's responsibility from design to handover. Materials, brands and grades are fixed by the structural design and the package agreed in writing; our work is to make sure every trade follows them and that each stage is checked before the next one hides it.
One written specification
Structure, finishes, fittings, interiors and external works are listed in a single package and scope, so every trade works to the same reference.
Design checked before construction
Architecture, structure, services and interiors are reviewed together for clashes before work starts, which reduces changes on site.
Reinforcement and concrete
Reinforcement is checked against the structural drawings before each pour, and concrete is mixed, compacted and cured as the relevant Indian Standard codes require.
Waterproofing and services
Wet areas and terraces are waterproofed and water-tested; plumbing lines are pressure-tested and electrical circuits checked before walls are closed.
Interiors and finishing
Carpentry, tiling, painting and fittings are checked against the approved drawings and selections, and samples are approved before bulk orders.
Inspections and handover
Each stage is inspected and recorded, and the final walk-through ends with a snag list that is closed before handover.
Typical timeline
These durations are indicative for a typical turnkey home or small commercial building. Actual time depends on size, scope, approvals, site conditions and how quickly selections are confirmed. The full schedule, from design to handover, is agreed in writing before work starts, and the handover date is an estimate that we update with you as work progresses.
Brief & scope agreement
Requirements, budget and the written scope and package, including items you will supply.
2–4 weeks
Design & drawings
Architecture, structure, services and, where scoped, interior layouts, reviewed together for clashes.
4–8 weeks
Approvals
Drawings are prepared and submitted with you; the authority decides the sanction.
As per the authority's process
Construction
Foundation, structure, masonry and services under daily supervision, with stage inspections.
4–8 weeks per floor
Finishing & interiors
Flooring, painting, fittings and interior work as scoped, sequenced on the same schedule.
8–14 weeks
Snagging & handover
Joint walk-through, snag closure, cleaning and handover of keys and documents.
1–3 weeks
Indicative ranges only. Your project's schedule is agreed in writing once the design and scope are final.
What changes the duration
Built-up area, floors and the scope of interiors
Time taken for sanction and other approvals
Soil and site conditions
How quickly selections and approvals are confirmed
We publish a project only with genuine site photographs and details the owner has confirmed. Ask our team about similar work, or request a visit to an ongoing site.
Whatever is listed in your written scope. Typically that covers design, drawings for sanction, structure, services, finishes and fittings to the agreed package, and it can include interiors and external works such as a compound wall or gate. Items that are not included, and items you will supply yourself, are listed too, so both sides know where the scope ends.
How is turnkey different from a labour-only contract?
In a labour-only contract you buy materials, coordinate designers and manage quality yourself, and the contractor supplies workers. In a turnkey contract, BHK99 is responsible for design coordination, materials to the agreed package, labour, supervision and handover. You still take the key decisions, but you have one team accountable for the result.
How are payments structured?
Payments follow construction stages agreed in writing before work starts, such as completion of the foundation, each slab, masonry and finishing. Each payment relates to work you can see on site, and the stage schedule is part of your agreement, so you always know which stage the next payment belongs to.
What if I want to change something during construction?
Tell us as early as possible. We explain what the change affects, including cost, time and any structural implications, and record it in writing as a change to the scope before it is carried out. Changes that would affect the structure are checked by the structural engineer first.
Who manages the workers and specialist contractors?
BHK99 does. The site engineer coordinates masons, bar-benders, carpenters, electricians, plumbers and any specialist teams on one schedule. You do not have to chase separate vendors for different parts of the build, and you have one point of contact for questions.
What documents do I receive at handover?
The architectural and structural drawings, records of stage inspections, details of the finishes and fittings installed, and any manufacturer documents for branded products. These are useful for maintenance, future changes and any sale or loan, so keep them together with your property papers.
Will I receive a detailed quotation before work begins?
Yes. Before you commit, we discuss the proposed scope and materials, then prepare a written quotation. Ask questions about what is included, excluded and when each stage is planned.
Can BHK99 handle my project from design to handover?
Yes. Our turnkey service can bring architecture, structural planning, construction, interiors and handover under one coordinated team, with one point of contact for the project.