Residential construction

Independent houses, duplexes and multi-storey residences planned around how your family lives — from foundation to finishes, with one team accountable for the whole build.

Modern two-storey villa with balconies behind tropical plantingIllustrative photo

What's included

  • Site assessment and requirement study
  • Structural design coordinated with architecture
  • Material planning and procurement
  • Civil, MEP and finishing works
  • Daily supervision by site engineers

Overview

Residential construction with BHK99

A home is usually the largest thing a family builds, and most families build only once. BHK99 takes on residential construction in Chhindwara, Seoni and Nagpur as a single accountable team: the people who study your plot and brief also prepare the structural design, manage materials and labour, and supervise the site every working day. You are not left coordinating a separate architect, engineer, contractor and supplier, or settling disagreements between them when something on site does not match a drawing.

Every house starts from your plot, your family and your budget rather than a stock plan. We look at orientation, road access, neighbouring buildings, soil and drainage before planning rooms, and we recommend a soil test so the foundation is designed for the ground it actually sits on. Floor plans, elevation and structure are worked out together, so the house you approve on paper is one the structure can carry, and changes are discussed while they are still drawings rather than demolition.

During construction you receive regular progress updates and site photographs, and shared progress and documents can be viewed in the BHK99 client portal. Materials, brands and grades follow the structural design and the package agreed in writing before work starts, so there is a clear reference whenever a question comes up. At handover we walk through the house with you, close the snag list and hand over the drawings and records you will need to maintain, extend or sell the home later.

Who it's for

  • Families building their first home

    If you have a plot and a rough idea of what you need, we help turn it into a buildable plan, explain each stage before it begins and keep you informed without expecting you to know construction.

  • Owners rebuilding on an old plot

    Where an older house is demolished and rebuilt, we plan around boundary lines, neighbouring walls, existing service connections and the setbacks your local authority requires.

  • Owners planning rental floors

    For G+2 and G+3 buildings with separate units, we plan independent entries, metering, water and drainage so each floor can be let or lived in on its own.

  • Owners who live away from the site

    If you work in another city, regular updates, site photographs and the client portal let you follow the build and take decisions without being on site every week.

Scope of work

  • Site assessment and requirement study
  • Structural design coordinated with architecture
  • Material planning and procurement
  • Civil, MEP and finishing works
  • Daily supervision by site engineers
  • Stage-wise quality inspections
  • Handover with documentation

Suited for

  • Independent houses
  • Duplex and G+2 homes
  • Rental and builder floors
  • Farmhouses

Every project is quoted after we understand your site and requirements. Share a few details and our team will call you.

City-wise rates →Cost calculator →

Step by step

How we deliver this construction

  1. 1

    Requirement & site study

    A site visit plus a conversation about your family, budget and how the home will be lived in — before a single drawing is made.

  2. 2

    Design & structural planning

    Floor plans, elevation and structural design are worked out together, so the look of the house and its engineering agree from day one.

  3. 3

    Approvals support

    Drawings are prepared in the format your local authority needs for sanction, and we support you through the submission.

  4. 4

    Construction with daily supervision

    A site engineer is present through excavation, structure, brickwork, finishing and services — not only at milestones.

  5. 5

    Stage-wise quality checks

    Each stage is inspected against the drawing before the next stage starts, so issues are caught while they're still easy to fix.

  6. 6

    Handover

    A joint walk-through, snag closure and complete documentation before the keys are handed to you.

What you receive

  • Floor plans and elevation drawings
  • Structural drawings and reinforcement details
  • Stage-wise site photographs and progress updates
  • Material and brand list as agreed in your package
  • Completion documentation at handover

Materials & quality

Materials & quality approach

Sound houses come from ordinary materials handled correctly at every stage. The structural design and the package you agree in writing decide which cement, steel, blocks and fittings are used; our job is to make sure what is specified is what arrives, and that it is stored, mixed, placed and cured properly.

  • Materials set by design and package

    Cement type, steel grade, concrete mix and masonry units come from the structural drawings and your agreed package, not from whatever is easiest to buy that day. Deliveries are checked against that list before use.

  • Reinforcement checked before every pour

    Before any footing, column, beam or slab is concreted, the site engineer checks bar sizes, spacing, laps, cover blocks and shuttering against the structural drawings. Concreting starts only after that check.

  • Concrete mixing and curing

    Concrete is mixed to the proportions in the design, with water added under supervision rather than by guesswork, compacted with vibrators and kept wet for the curing period the relevant Indian Standard codes call for.

  • Masonry, plaster and waterproofing

    Blocks or bricks are prepared as their type requires, laid true to line and level, and plastered once the wall has set. Bathrooms, terraces and sunken areas are waterproofed and water-tested before tiling.

  • Electrical and plumbing practice

    Conduits and pipes follow a drawn layout and are photographed before plastering, so you know where concealed lines run. Water lines are pressure-tested and circuits checked before walls are closed.

  • Stage inspections

    Foundation, plinth, each slab, masonry, services and finishing are inspected against the drawings before the next stage begins, and the findings are recorded so you can see what was checked and when.

Typical timeline

These durations are indicative for a typical independent house. Actual time depends on the size and design of the house, sanction and other approvals, soil and site conditions, weather and how quickly selections are made. Your schedule is agreed in writing before work starts, and any handover date is an estimate that we update with you as work progresses.

  1. Planning & design

    Site study, soil test, floor plans, elevation and structural design, revised until you approve them.

    3–6 weeks

  2. Approvals

    Drawings are prepared and submitted with you. The time taken depends on the local authority, which decides the sanction.

    As per the authority's process

  3. Foundation & plinth

    Excavation, footings, plinth beams and plinth filling, depending on soil and foundation type.

    3–6 weeks

  4. Structure

    Columns, beams and slabs for each floor, including the time concrete needs to cure before loading.

    4–8 weeks per floor

  5. Masonry, plaster & services

    Walls, electrical and plumbing lines, plastering and waterproofing of wet areas and terraces.

    6–12 weeks

  6. Finishing & handover

    Flooring, tiling, doors, windows, painting and fittings, then the walk-through, snag closure and handover.

    6–10 weeks

Indicative ranges only. Your project's schedule is agreed in writing once the design and scope are final.

What changes the duration

  • Built-up area and number of floors
  • Soil conditions and the type of foundation they need
  • Time taken for sanction and other approvals
  • Monsoon rain and peak summer heat, which affect concreting and curing
  • How quickly finishes and fittings are selected
  • Design changes made after work has started

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Questions we often hear

How long does it take to build a house?

It depends on the size of the house, the number of floors, the soil, approvals and how quickly selections are made. The indicative phases on this page give a rough picture, but we commit to a schedule only after the design is fixed and the site is studied. That schedule is agreed in writing, and the handover date in it is an estimate that we update with you as work progresses.

Do I need a soil test?

We recommend one for almost every new house. A soil test tells the structural engineer how much load the ground can take and at what depth, which decides the type and size of the foundation. Without it the engineer has to make cautious assumptions, which can mean a heavier foundation than needed or one that does not suit the ground. We can help you arrange the test with a testing agency.

Which brands of cement, steel and fittings will you use?

That is decided by the package you choose and the structural design, and it is written into your agreement before work starts. We do not change brands or grades on our own. If you want a different brand or a higher specification for any item, we discuss the effect on cost and timing with you and record the change in writing first.

Will you handle the building sanction?

We prepare drawings in the format your local authority requires and support you through the submission, including answering queries on the drawings. The sanction itself is granted by the authority, and the time it takes depends on their process. Construction begins once the required approvals are in place.

How will I know what is happening on site?

A site engineer supervises the work daily, and you receive regular progress updates with site photographs. Shared progress, drawings and documents can also be viewed in the BHK99 client portal. Stage inspections are recorded, and you are welcome to visit at any stage; we only ask that visits during concreting are planned with the site engineer for safety.

Can I change the design once construction has started?

Small changes are often possible, but the earlier they are made the easier they are. Anything that affects the structure has to be checked by the structural engineer first, and some changes may not be safe once the frame is cast. Every change is discussed with you, including its effect on cost and time, and recorded in writing before it is carried out.

Is interior work included?

It depends on the scope you agree. Your package lists which finishes, such as flooring, painting, doors, windows and sanitary fittings, are included and to what specification. Modular kitchens, wardrobes and other interior work can be planned alongside construction through our interior design service and added to the scope in writing if you want them.

What do I receive at handover?

A joint walk-through of the house, closure of the snag list, and the drawings and documents for your home, including the structural drawings and the records of stage inspections. Keep these safely: they are useful for maintenance, for adding a floor later, and for any future sale or home loan.

Will I receive a detailed quotation before work begins?

Yes. Before you commit, we discuss the proposed scope and materials, then prepare a written quotation. Ask questions about what is included, excluded and when each stage is planned.

How will I see the work happening at site?

Your project team shares regular site updates. For active projects, the BHK99 client portal is designed to bring approved updates, photos, milestones and documents together in one place.

Can BHK99 handle my project from design to handover?

Yes. Our turnkey service can bring architecture, structural planning, construction, interiors and handover under one coordinated team, with one point of contact for the project.