Duplexes & Villas

Duplexes and villas need careful planning of stairs, double-height spaces, terraces and outdoor areas. We design and build them as one project, so the look and the structure agree.

Modern two-storey villa with balconies behind tropical plantingIllustrative photo

Suited for

  • Families wanting a two-level home
  • Villas on larger plots with gardens
  • Row houses and twin bungalows
  • Owners wanting a distinctive elevation

Overview

Duplexes & Villas by BHK99

A duplex or villa usually has more going on than a simple house: an internal staircase, perhaps a double-height living room, balconies, a terrace garden, a porch and landscaped open space. Each of these affects the structure, the waterproofing and the services, so we plan them together from the first drawing rather than adding them later.

The elevation is developed alongside the structure, and 3D views can be included so you can review proportions and materials before work begins. On site, the same daily supervision and stage inspections apply, with extra attention to cantilevers, large openings and exposed concrete surfaces.

What's included

  • Plot study and planning of indoor and outdoor spaces
  • Floor plans, elevation and 3D views where scoped
  • Structural design for stairs, voids, cantilevers and large openings
  • Drawings for sanction and support with the submission
  • Waterproofing for terraces, balconies and planters
  • Construction under daily supervision with stage inspections
  • Finishing as per the agreed package, and handover documents

Our approach

What we pay attention to

  • Double-height and open spaces

    Voids and large spans are worked out by the structural engineer with the architect, so beams and columns sit where the design can absorb them.

  • Terraces that drain properly

    Roof gardens, balconies and planters get slopes, outlets and waterproofing planned at design stage and water-tested before finishes.

  • An elevation that can be built

    Projections, fins and cladding are detailed for construction, not only drawn in a rendering.

Step by step

How the work proceeds

  1. 1

    Requirement & site study

    A site visit plus a conversation about your family, budget and how the home will be lived in — before a single drawing is made.

  2. 2

    Design & structural planning

    Floor plans, elevation and structural design are worked out together, so the look of the house and its engineering agree from day one.

  3. 3

    Approvals support

    Drawings are prepared in the format your local authority needs for sanction, and we support you through the submission.

  4. 4

    Construction with daily supervision

    A site engineer is present through excavation, structure, brickwork, finishing and services — not only at milestones.

  5. 5

    Stage-wise quality checks

    Each stage is inspected against the drawing before the next stage starts, so issues are caught while they're still easy to fix.

  6. 6

    Handover

    A joint walk-through, snag closure and complete documentation before the keys are handed to you.

Typical timeline

These durations are indicative for a typical independent house. Actual time depends on the size and design of the house, sanction and other approvals, soil and site conditions, weather and how quickly selections are made. Your schedule is agreed in writing before work starts, and any handover date is an estimate that we update with you as work progresses.

  • Planning & design3–6 weeks
  • ApprovalsAs per the authority's process
  • Foundation & plinth3–6 weeks
  • Structure4–8 weeks per floor
  • Masonry, plaster & services6–12 weeks
  • Finishing & handover6–10 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Duplexes & Villas: common questions

What is the difference between a duplex and a G+1 house?

The terms overlap. A duplex is usually one home spread over two levels joined by an internal staircase, while a G+1 can also mean two separate units. We plan whichever arrangement suits your family.

Can we see the house in 3D before construction?

Yes. Exterior and interior 3D views can be added to the design scope so you can review the elevation, colours and materials before anything is built.

Are terrace gardens a leakage risk?

They can be if they are not planned. We design slopes, drainage outlets and waterproofing for planted areas from the start, and test them with water before the finishes go on.

Will I receive a detailed quotation before work begins?

Yes. Before you commit, we discuss the proposed scope and materials, then prepare a written quotation. Ask questions about what is included, excluded and when each stage is planned.

How will I see the work happening at site?

Your project team shares regular site updates. For active projects, the BHK99 client portal is designed to bring approved updates, photos, milestones and documents together in one place.

Can BHK99 handle my project from design to handover?

Yes. Our turnkey service can bring architecture, structural planning, construction, interiors and handover under one coordinated team, with one point of contact for the project.