Skip to content

Construction · Residential

Farmhouses

Farmhouses and weekend homes on agricultural or peri-urban land, planned around access, water, power and the open landscape.

Single-storey house with a tiled roof and a long verandah among palm treesIllustrative photo

Suited for

  • Weekend and retirement homes
  • Families living on their farmland
  • Plots on the outskirts of Chhindwara, Seoni or Nagpur
  • Homes with outbuildings or staff quarters

Overview

Farmhouses by BHK99

Building outside town brings its own questions: how materials and water will reach the site, where power will come from, how rainwater and waste will be handled, and what land-use permissions apply. We look at these first, because they shape the schedule and the budget as much as the design does.

The house can be planned with verandahs, cross-ventilation, an outdoor kitchen, store rooms and staff quarters, and it gets the same structural design, supervision and stage inspections as a house in town. Please confirm the land-use and permission requirements for your land with the authority or a legal adviser before planning begins.

What's included

  • Site visit covering access, water source, power and drainage
  • Planning of the house, verandahs, outbuildings and open areas
  • Structural design suited to the site's soil
  • Drawings for whatever permission process your land requires
  • Material and water logistics planning for a remote site
  • Septic tank and soak-pit planning where there is no sewer
  • Construction with daily supervision and stage inspections

Our approach

What we pay attention to

  • Logistics planned first

    Road access, material storage and water for construction are sorted before work starts, so the site does not stall.

  • Built for open land

    Wind, rain and sun exposure are considered in roof overhangs, verandah depths and window placement.

  • Services without town supply

    Borewell, overhead tank, septic tank and power backup positions are planned with the house, not after it.

Step by step

How the work proceeds

  1. 1

    Requirement & site study

    A site visit plus a conversation about your family, budget and how the home will be lived in — before a single drawing is made.

  2. 2

    Design & structural planning

    Floor plans, elevation and structural design are worked out together, so the look of the house and its engineering agree from day one.

  3. 3

    Approvals support

    Drawings are prepared in the format your local authority needs for sanction, and we support you through the submission.

  4. 4

    Construction with daily supervision

    A site engineer is present through excavation, structure, brickwork, finishing and services — not only at milestones.

  5. 5

    Stage-wise quality checks

    Each stage is inspected against the drawing before the next stage starts, so issues are caught while they're still easy to fix.

  6. 6

    Handover

    A joint walk-through, snag closure and complete documentation before the keys are handed to you.

Typical timeline

These durations are indicative for a typical independent house. Actual time depends on the size and design of the house, sanction and other approvals, soil and site conditions, weather and how quickly selections are made. Your schedule is agreed in writing before work starts, and any handover date is an estimate that we update with you as work progresses.

  • Planning & design3–6 weeks
  • ApprovalsAs per the authority's process
  • Foundation & plinth3–6 weeks
  • Structure4–8 weeks per floor
  • Masonry, plaster & services6–12 weeks
  • Finishing & handover6–10 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Farmhouses: common questions

Can a farmhouse be built on agricultural land?

It depends on the land's classification and local rules, which differ by area. Please confirm with the authority or your legal adviser first; we prepare drawings for whatever permission process applies.

How do you manage construction on a remote site?

Access, material storage, water and labour arrangements are planned before work begins, and deliveries are scheduled to suit the road. Site supervision is the same as on a town site.

What if there is no sewer connection?

We plan a septic tank and soak pit, or another system suited to the site and local rules, placed at a safe distance from your water source.

Will I receive a detailed quotation before work begins?

Yes. Before you commit, we discuss the proposed scope and materials, then prepare a written quotation. Ask questions about what is included, excluded and when each stage is planned.

How will I see the work happening at site?

Your project team shares regular site updates. For active projects, the BHK99 client portal is designed to bring approved updates, photos, milestones and documents together in one place.

Can BHK99 handle my project from design to handover?

Yes. Our turnkey service can bring architecture, structural planning, construction, interiors and handover under one coordinated team, with one point of contact for the project.