Construction · Residential
Independent Houses
A house designed for your plot and the way your family lives, built by one team from the first site visit to handover.
Illustrative photoSuited for
- Families building on their own plot
- Owners replacing an old house
- Ground-floor and G+1 houses
- Owners planning to add a floor later
Overview
Independent Houses by BHK99
An independent house gives you full control over layout, orientation and finishes, but it also means many decisions in a short time. We help you take them in the right order: plot study and soil test first, then floor plans and elevation, then the structural design that makes them buildable. Once the drawings are approved, the same team builds the house under daily supervision and inspects each stage before moving on.
If you expect to add a floor in a few years, tell us at the start. The foundation and columns can be designed for that load now, so the future floor does not need strengthening work or guesswork about what the house can carry.
What's included
- Site visit, plot measurement and soil test recommendation
- Floor plans and elevation drawings for your approval
- Structural design and reinforcement drawings
- Drawings for sanction and support with the submission
- Construction from excavation to finishing under daily supervision
- Stage inspections with site photographs and progress updates
- Joint walk-through, snag closure and handover documents
Our approach
What we pay attention to
Planned for the plot
Orientation, light, cross-ventilation, parking and setbacks are worked into the plan before room sizes are fixed.
Ready for a future floor
If you plan to build upward later, the foundation and columns can be designed for those loads from the start.
Decisions in the right order
We tell you which selections are needed at each stage, so tiles, fittings and doors are chosen before they hold up work.
Step by step
How the work proceeds
Requirement & site study
A site visit plus a conversation about your family, budget and how the home will be lived in — before a single drawing is made.
Design & structural planning
Floor plans, elevation and structural design are worked out together, so the look of the house and its engineering agree from day one.
Approvals support
Drawings are prepared in the format your local authority needs for sanction, and we support you through the submission.
Construction with daily supervision
A site engineer is present through excavation, structure, brickwork, finishing and services — not only at milestones.
Stage-wise quality checks
Each stage is inspected against the drawing before the next stage starts, so issues are caught while they're still easy to fix.
Handover
A joint walk-through, snag closure and complete documentation before the keys are handed to you.
Typical timeline
These durations are indicative for a typical independent house. Actual time depends on the size and design of the house, sanction and other approvals, soil and site conditions, weather and how quickly selections are made. Your schedule is agreed in writing before work starts, and any handover date is an estimate that we update with you as work progresses.
- Planning & design3–6 weeks
- ApprovalsAs per the authority's process
- Foundation & plinth3–6 weeks
- Structure4–8 weeks per floor
- Masonry, plaster & services6–12 weeks
- Finishing & handover6–10 weeks
Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.
Projects
Independent Houses: projects
Project Enquiry
Tell us about your construction requirements and our team will get in touch.
Our Locations
We serve key locations with a local, on-ground approach.
Independent Houses: common questions
Can the house be designed so we can add a floor later?
Yes. Tell us at the start and the structural engineer designs the foundation and columns for the extra floor. It adds to the foundation and column work now, but makes a later floor far simpler.
Do you build on narrow or irregular plots?
Yes. Narrow and irregular plots need more careful planning for light, ventilation and the staircase, so we study the plot and the required setbacks before proposing a layout.
Who prepares the drawings?
Our architects and structural engineers prepare the floor plans, elevation and structural drawings together, so the design and the structure agree before construction starts.
Will I receive a detailed quotation before work begins?
Yes. Before you commit, we discuss the proposed scope and materials, then prepare a written quotation. Ask questions about what is included, excluded and when each stage is planned.
How will I see the work happening at site?
Your project team shares regular site updates. For active projects, the BHK99 client portal is designed to bring approved updates, photos, milestones and documents together in one place.
Can BHK99 handle my project from design to handover?
Yes. Our turnkey service can bring architecture, structural planning, construction, interiors and handover under one coordinated team, with one point of contact for the project.
More residential services
- Duplexes & VillasTwo-level homes and villas with stairs, voids and terraces planned with care.Explore duplexes & villas
Illustrative photo - Multi-storey & Rental HomesG+2 and G+3 buildings, builder floors and rental units planned floor by floor.Explore multi-storey & rental homes
Illustrative photo - FarmhousesHomes on farmland and town outskirts, planned for water, power and access.Explore farmhouses
Illustrative photo