Construction · Residential

Multi-storey & Rental Homes

Buildings with several floors or units, planned so each floor can work on its own, from family homes with rental floors to builder floors.

Row of balconies on a new multi-storey residential buildingIllustrative photo

Suited for

  • Joint families wanting separate floors
  • Owners planning rental income
  • Builder floors for sale
  • Owners building in phases

Overview

Multi-storey & Rental Homes by BHK99

Many owners build upward to house a joint family, earn rental income or sell individual floors. A G+2 or G+3 building asks more of the structure, the staircase and the services than a single house, and the local rules on height, setbacks and floor area matter more.

We plan each floor as its own home where needed, with a separate entry, electricity meter position, water supply and drainage, and we design the structure for the full height from the start. Construction proceeds floor by floor with the same stage inspections, and the work can be phased if you intend to complete some floors later.

What's included

  • Planning within local height, setback and floor-area rules
  • Floor plans for each unit, with independent entries where required
  • Structural design for the full building height
  • Separate meter positions, water lines and drainage per unit
  • Staircase, parking and common-area planning
  • Construction floor by floor with stage inspections
  • Phased construction where some floors are completed later

Our approach

What we pay attention to

  • Each floor stands on its own

    Separate meter positions, water lines and entries let tenants or family members live independently.

  • Structure for the full height

    The foundation and columns are designed for every floor you plan, even if some are built later.

  • Rules checked early

    Height, setback and floor-area limits are checked before planning, so the design is one the authority can consider.

Step by step

How the work proceeds

  1. 1

    Requirement & site study

    A site visit plus a conversation about your family, budget and how the home will be lived in — before a single drawing is made.

  2. 2

    Design & structural planning

    Floor plans, elevation and structural design are worked out together, so the look of the house and its engineering agree from day one.

  3. 3

    Approvals support

    Drawings are prepared in the format your local authority needs for sanction, and we support you through the submission.

  4. 4

    Construction with daily supervision

    A site engineer is present through excavation, structure, brickwork, finishing and services — not only at milestones.

  5. 5

    Stage-wise quality checks

    Each stage is inspected against the drawing before the next stage starts, so issues are caught while they're still easy to fix.

  6. 6

    Handover

    A joint walk-through, snag closure and complete documentation before the keys are handed to you.

Typical timeline

These durations are indicative for a typical independent house. Actual time depends on the size and design of the house, sanction and other approvals, soil and site conditions, weather and how quickly selections are made. Your schedule is agreed in writing before work starts, and any handover date is an estimate that we update with you as work progresses.

  • Planning & design3–6 weeks
  • ApprovalsAs per the authority's process
  • Foundation & plinth3–6 weeks
  • Structure4–8 weeks per floor
  • Masonry, plaster & services6–12 weeks
  • Finishing & handover6–10 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Multi-storey & Rental Homes: common questions

Can we build two floors now and the rest later?

Yes, if the structure is designed for the full height from the beginning. We design the foundation and columns for all planned floors and leave the building safe and weatherproof between phases.

Can each floor have its own electricity meter?

We plan separate meter positions, wiring and water lines for each unit. The meter connections themselves are applied for and issued by the electricity company.

How many floors can I build on my plot?

That depends on the plot size, road width and your local authority's rules. We check these at the start and plan within what they allow; the authority decides through the sanction.

Will I receive a detailed quotation before work begins?

Yes. Before you commit, we discuss the proposed scope and materials, then prepare a written quotation. Ask questions about what is included, excluded and when each stage is planned.

How will I see the work happening at site?

Your project team shares regular site updates. For active projects, the BHK99 client portal is designed to bring approved updates, photos, milestones and documents together in one place.

Can BHK99 handle my project from design to handover?

Yes. Our turnkey service can bring architecture, structural planning, construction, interiors and handover under one coordinated team, with one point of contact for the project.