Floor Additions & Extensions

Adding a floor or extending a room, starting with an engineering check of whether the existing structure can safely carry the new work.

Reinforced concrete frame of a multi-storey building under constructionIllustrative photo

Suited for

  • Families needing more space
  • Owners adding a rental floor
  • Extending a ground-floor house
  • Shops adding an upper floor

Overview

Floor Additions & Extensions by BHK99

Many houses in our towns were built with the idea of adding a floor later, but not all of them were designed for it. Before planning a new floor, our structural engineer assesses the existing foundation, columns and slab, using the original drawings where they exist and site investigation where they do not.

If the structure can carry the addition, we design the new floor to suit it and to connect properly with the existing columns. If it cannot, we explain the options, which may include strengthening or a lighter form of construction, so you can decide with the facts in front of you.

What's included

  • Structural assessment of the existing building
  • Review of original drawings, or investigation where none exist
  • Design of the new floor or extension to suit the existing structure
  • Strengthening design where the assessment shows it is needed
  • Drawings for sanction of the addition, and submission support
  • Protection of the floors below during construction
  • Construction with stage inspections and updated drawings at handover

Our approach

What we pay attention to

  • Assessment before design

    Nothing is proposed until an engineer has checked what the existing building can safely carry.

  • Proper connections

    New columns are tied into existing ones with details designed for your building, not improvised on site.

  • Living below

    Roof waterproofing, access and safety are planned so the floors below can stay occupied where it is safe.

Step by step

How the work proceeds

  1. 1

    Structural condition assessment

    An engineer assesses the existing structure first — what it can safely carry, and what it cannot — before anything is proposed.

  2. 2

    Scope finalisation

    Based on the assessment, we agree exactly what can be added, extended or changed safely.

  3. 3

    Design for the addition or repair

    Drawings are prepared for the specific work — a floor addition, a repair, or a remodel — matched to the existing structure.

  4. 4

    Execution with minimal disruption

    Work is sequenced to keep the rest of the building usable wherever possible, especially for occupied homes and shops.

  5. 5

    Final check & handover

    A final inspection against the design, then handover with updated documentation.

Typical timeline

These durations are indicative and vary widely, because every existing building is different. Actual time depends on the scope, what the assessment finds, approvals for structural changes or additions, whether the building stays occupied, and site conditions. The schedule is agreed in writing before work starts, and the completion date is an estimate updated as work proceeds, especially once hidden conditions are opened up.

  • Assessment & scope1–3 weeks
  • Design & approvals2–6 weeks
  • Preparation & demolition1–3 weeks
  • Repair, structure & services3–8 weeks
  • Finishing & handover2–6 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Projects

Floor Additions & Extensions: projects

All projects

Project photos are on their way

We publish a project only with genuine site photographs and details the owner has confirmed. Ask our team about similar work, or request a visit to an ongoing site.

Request a site visit

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Floor Additions & Extensions: common questions

Can my house take another floor?

Only an assessment can answer that. It depends on how the foundation, columns and slab were designed and built, which we check before proposing anything.

We do not have the original drawings. Is that a problem?

It means more investigation on site, such as checking column sizes and reinforcement at selected points, but it does not rule out an addition.

Can we live in the house during the work?

Often, yes. We plan access, roof protection and safety so the floors below remain usable, and tell you in advance about any days when that is not safe.