Waterproofing & Damp Repair

Waterproofing and damp repair that starts by finding where the water is coming from, then treats the source rather than only the stain.

Workers repairing and painting the front of an Indian houseIllustrative photo

Suited for

  • Leaking roofs and terraces
  • Damp walls and peeling paint
  • Bathrooms leaking to rooms below
  • Basements and plinth-level damp

Overview

Waterproofing & Damp Repair by BHK99

Leaks and damp patches damage plaster, paint, woodwork and eventually the reinforcement inside the concrete. The visible stain is often some distance from where water actually enters, so we inspect roofs, terraces, bathrooms, plumbing lines, external walls and the plinth to trace the source before proposing a treatment.

The treatment is chosen for the location and the cause: roof and terrace treatment, bathroom re-waterproofing, joint sealing, external wall treatment, rising-damp control or plumbing repair. Treated areas are water-tested where practical before finishes are restored.

What's included

  • Inspection to trace the source of leaks and damp
  • Roof and terrace waterproofing with slopes and outlets corrected
  • Bathroom and wet-area re-waterproofing
  • External wall, joint and crack sealing
  • Rising-damp and plinth-level treatment
  • Repair of leaking concealed plumbing where it is the cause
  • Water testing where practical and restoration of finishes

Our approach

What we pay attention to

  • Source first

    We trace where water enters before treating anything, so the work targets the cause.

  • Slopes and drains

    Many roof leaks come from standing water, so slopes and outlets are corrected along with the treatment.

  • Tested before finishing

    Treated areas are water-tested where practical before tiles or paint go back on.

Step by step

How the work proceeds

  1. 1

    Structural condition assessment

    An engineer assesses the existing structure first — what it can safely carry, and what it cannot — before anything is proposed.

  2. 2

    Scope finalisation

    Based on the assessment, we agree exactly what can be added, extended or changed safely.

  3. 3

    Design for the addition or repair

    Drawings are prepared for the specific work — a floor addition, a repair, or a remodel — matched to the existing structure.

  4. 4

    Execution with minimal disruption

    Work is sequenced to keep the rest of the building usable wherever possible, especially for occupied homes and shops.

  5. 5

    Final check & handover

    A final inspection against the design, then handover with updated documentation.

Typical timeline

These durations are indicative and vary widely, because every existing building is different. Actual time depends on the scope, what the assessment finds, approvals for structural changes or additions, whether the building stays occupied, and site conditions. The schedule is agreed in writing before work starts, and the completion date is an estimate updated as work proceeds, especially once hidden conditions are opened up.

  • Assessment & scope1–3 weeks
  • Design & approvals2–6 weeks
  • Preparation & demolition1–3 weeks
  • Repair, structure & services3–8 weeks
  • Finishing & handover2–6 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Projects

Waterproofing & Damp Repair: projects

All projects

Project photos are on their way

We publish a project only with genuine site photographs and details the owner has confirmed. Ask our team about similar work, or request a visit to an ongoing site.

Request a site visit

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Waterproofing & Damp Repair: common questions

Do I have to break my bathroom tiles to fix a leak?

Not always. If the source is a joint or a fitting, a local repair may work. If the waterproofing layer has failed, the tiles usually need to come up.

When is the best time to waterproof a roof?

Dry weather, before the monsoon, so the surface can be prepared and treated properly and then tested before the rains arrive.

Will the damp come back?

Damp returns when the source is missed or not maintained. Finding the source and keeping drains and outlets clear give the treatment the best chance of lasting.