Design & engineering · Vastu Planning
Vastu Home Planning
House layouts planned with your Vastu preferences in mind, covering entries, kitchen, pooja room, bedrooms and stairs, and balanced with light, ventilation and the plot.
IllustrationSuited for
- New independent houses
- Duplexes and villas
- Homes with a separate pooja room
- Families working with a Vastu consultant
Overview
Vastu Home Planning by BHK99
For a new home, we consider Vastu from the first layout, so your preferences shape the plan instead of being forced in later. The entry, kitchen, pooja room, main bedroom, staircase, toilets, overhead and underground tanks and septic tank are placed with your stated priorities in view.
Where a preference conflicts with the plot or the building rules, we show you the options and their trade-offs. The agreed layout then carries through to the working, structural and plumbing drawings.
What's included
- North marking and plot review
- Record of your Vastu priorities
- Entry and gate placement study
- Kitchen, pooja room and bedroom placement
- Staircase and toilet placement
- Water tank and septic tank positions
- Coordination with your consultant
- Integration into all drawings
Our approach
What we pay attention to
Planned from the start
Preferences shape the first layout instead of being patched in later.
Trade-offs explained
Where a preference cannot be met, you see why and what the alternatives are.
Carried into services
Tank, septic and plumbing positions follow the agreed layout.
Step by step
How the work proceeds
Plot orientation & entry review
Your plot's direction and the main entry are reviewed against Vastu principles, alongside the practical realities of the site.
Room-placement study
Kitchen, pooja room, bedrooms and other spaces are positioned to respect Vastu guidance without breaking the floor plan's function.
Coordination with your consultant
If you already work with a Vastu consultant, we coordinate directly with them rather than overriding their guidance.
Integration into the plan
Agreed adjustments are built into the architectural and structural drawings, not treated as an afterthought.
Typical timeline
Vastu planning runs alongside architectural design rather than as a separate project. These indicative durations assume the plot and brief are ready; the schedule is agreed in writing.
- Plot & orientation review3–7 days
- Preference discussion2–5 days
- Layout planning2–4 weeks
- Consultant coordinationas agreed
- Integration into drawingsongoing
Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.
Projects
Vastu Home Planning: projects
Project photos are on their way
We publish a project only with genuine site photographs and details the owner has confirmed. Ask our team about similar work, or request a visit to an ongoing site.
Project Enquiry
Tell us about your construction requirements and our team will get in touch.
Our Locations
We serve key locations with a local, on-ground approach.
Vastu Home Planning: common questions
Can a Vastu layout still have good daylight?
Yes. We balance placements with orientation and openings so rooms stay bright and well ventilated.
Does Vastu planning affect construction cost?
It can, where a placement needs extra structure or longer service runs. We point this out at the layout stage.
Do you plan the plot entrance too?
Yes. The gate and main entry are considered together with parking and road access.
How will I see the work happening at site?
Your project team shares regular site updates. For active projects, the BHK99 client portal is designed to bring approved updates, photos, milestones and documents together in one place.
More vastu planning services
- Vastu for Shops, Offices & FactoriesShop, office and factory layouts with Vastu preferences and working needs balanced.Explore vastu for shops, offices & factories
BHK99 project photograph - Plot & Orientation ReviewCheck a plot's orientation, shape and entry options before you buy or design.Explore plot & orientation review
Illustration
