Two quotes for the same house rarely price the same thing. Here is a four-step way to compare them fairly: match the area, match the scope, match tax, then compare specifications and terms, with a sheet you can fill in.
The quote with the lowest per sq ft rate is often not the lowest price. To compare two house construction quotes fairly, put them on the same area, the same list of included work, the same tax treatment and the same specification. Only then does the difference in price mean something.
This guide from BHK 99 Real Estate and Constructions gives you a four-step method, a worked example and a comparison sheet you can fill in with your own quotes. It builds on our guide to which area a per sq ft rate is multiplied by.
Before you compare: give everyone the same brief
Quotes can only be compared if every contractor priced the same house. Before you ask for prices, give each contractor the same things:
- The same drawing set, with its revision number or date.
- The same list of what you want built, including the boundary wall, tanks, porch and terrace work if you want them.
- The same specification sheet, or a request to state their own in full.
- A request to state the area basis, the GST position and how long the price is valid.
Government departments do the same thing for their own works. The Government of India's Manual for Procurement of Works (2025) warns that when bidders use different price formulas and base dates, it becomes hard to bring their prices onto a common comparable footing. Your house is smaller, but the problem is the same.
Step 1: Put every quote on the same area
A per sq ft quote is rate × area. If one contractor measures plinth area and another measures every slab, their rates are not comparable. Our area guide explains the difference using IS 3861, the Indian standard for measuring building areas.
The simple fix is to pick one area, usually the plinth area from your drawing, and work out each quote's effective rate on that area:
- Effective rate = quote total ÷ common area.
If a contractor will not tell you which area they measured, ask them to restate the price on the area shown on your drawing.
Step 2: Make the scope match
Next, line up what each quote includes. Typical differences are the boundary wall and gate, underground and overhead water tanks, septic tank, the stair cover on the terrace (mumty), porch, plinth height above the road, extra foundation depth, electrical and water connections, drawings and approval fees, elevation work and interiors.
For every item that one quote includes and another leaves out, ask the contractor who left it out to price it in writing. Do not fill the gap with your own guess, because a guessed number can decide the comparison. If neither quote includes an item, leave it out of the comparison but keep it in your budget.
Step 3: Put tax on the same footing
Check whether each quote includes GST. If one includes it and the other says "GST extra", compare both with GST added. Whether GST applies and at what rate depends on the kind of contract, so ask each contractor to show it separately and check the current position with your chartered accountant.
Step 4: Compare specifications and terms
Once area, scope and tax match, the remaining price difference usually comes from specification and terms. This is where you decide on value, not just price.
Specification lines to check
Ask both contractors to name the standard, grade and brand for the main materials, so that "good quality cement" becomes something you can check:
- Cement: the type and grade, for example Ordinary Portland Cement of grade 43 or 53 under IS 269:2015, or Portland Pozzolana Cement under IS 1489 (Part 1):2015. Cement under these standards is on the Bureau of Indian Standards' list of products that need compulsory certification, so the bags should carry the ISI mark.
- Steel reinforcement: the grade under IS 1786:2008, such as Fe 500 or Fe 500D, and the brand. These bars are also under compulsory BIS certification.
- Concrete grade: this comes from your structural engineer's drawings, not from the quote. Check that both quotes price the grade shown on the drawing.
- Walling: burnt clay bricks (IS 1077) or autoclaved aerated concrete blocks (IS 2185 Part 3), with size and source.
- Finishes: floor and wall tiles (size, type, brand), sanitaryware and taps, wiring and switches, doors and windows, paint for inside and outside, and terrace and bathroom waterproofing.
If one quote says "or equivalent", ask who decides what is equivalent. Which cement type or steel grade suits your house is a decision for your structural engineer. The quote should simply match the drawing.
Terms to check
- Payment schedule. Payments should follow work that has actually been done. The Government of India's works manual asks for payment milestones that match stage-wise work and warns against front-loading, which means asking for more money early than the work done so far justifies.
- Validity. Ask until what date the price holds. In central government works, a bid stays valid for the period stated in the tender, or 90 days if none is stated. Your contractor should write a date too.
- Price changes. Does the quote fix the price, or pass on rises in cement and steel prices? If it passes them on, ask for the base date and the formula in writing.
- Changes you ask for. How will extra or omitted work be priced: by a rate list attached to the quote, or by fresh negotiation?
- Final measurement. How and when the final area or quantities will be measured, and whether you or your representative will be present.
- Time. The completion period, and what happens if it slips.
Per sq ft quotes and BOQ quotes are compared differently
Most house quotes are per sq ft packages. Some contractors give a BOQ (bill of quantities) instead, which lists each item of work with its quantity, unit and rate.
The works manual describes these two ideas as different contract types. In an item-rate contract, the contractor quotes a rate for each BOQ item and is paid for the quantity actually measured. In a lump-sum contract, one fixed price covers work defined by drawings and specifications, and additions or omissions are priced from an agreed rate list.
To compare BOQ quotes:
- Check that every quote has the same list of items. A missing item makes a quote look cheaper.
- Check the quantities against your drawings. The Indian standard method for measuring these quantities is the IS 1200 series, which has a separate part for each kind of work, so ask which method the quantities follow.
- Compare rate by rate, and look hard at any rate far below or above the others.
- Check the arithmetic: each line's quantity × rate, and the total.
- Look for allowances for items not yet decided, such as tiles or fittings, and make sure both quotes carry the same allowance.
To compare a per sq ft quote with a BOQ quote, ask the per sq ft contractor for their specification sheet and list of exclusions, then follow the four steps above.
Worked example: the lower rate that costs more
This is an illustrative example, not a real project. As in our area guide, the rate is shown as the letter R so the method is clear without quoting prices.
The house: two floors, with a plinth area of 800 sq ft on each floor, so 1,600 sq ft in total.
- Quote A: rate R per sq ft on plinth area, 1,600 sq ft, so 1,600R. Mumty and underground tank extra. Boundary wall not included. GST extra. Price fixed.
- Quote B: rate 0.9R per sq ft on slab area, 1,850 sq ft, so 0.9 × 1,850 = 1,665R. Mumty and underground tank included. Boundary wall not included. GST included. Cement and steel price rises passed on.
Quote B's rate is 10 percent lower, so it looks cheaper. Now apply the steps.
- Step 1, area: on the common plinth area of 1,600 sq ft, Quote B's effective rate is 1,665R ÷ 1,600 = 1.04R. Its rate is about 4 percent higher, not 10 percent lower.
- Step 2, scope: Contractor A prices the mumty and tank in writing at 60R in total (illustrative), so Quote A becomes 1,660R. The boundary wall is in neither quote, so it stays out of the comparison and goes into the budget.
- Step 3, tax: Quote B's 1,665R already includes GST. Quote A's 1,660R does not. Once GST is added to Quote A, it costs more than Quote B.
- Step 4, terms: Quote A fixes its price; Quote B passes on cement and steel price rises. Quote B's total can still go up.
The result: the two quotes are now very close, and the choice depends on specification, price-change terms, payment schedule and how each contractor works, not on the rate you were first shown.
A comparison sheet you can fill in
Make one column for each quote and fill in these rows. Leave nothing blank; write "not stated" where a quote is silent, and ask about it.
- Drawing set and revision priced.
- Area basis, and the area used.
- Rate and quoted total.
- Total on the common area (effective rate).
- Items included.
- Items excluded, each priced in writing by that contractor.
- Cement: standard, type, grade, brand.
- Steel: standard, grade, brand.
- Concrete grade, as per the structural drawing.
- Walling: bricks or blocks, size, source.
- Tiles, sanitaryware and taps, wiring and switches, doors and windows, paint, waterproofing.
- GST: included or extra.
- Price-change clause for cement and steel.
- Payment schedule and the stage each payment is linked to.
- Valid until (date).
- Completion period, and what happens on delay.
- How design changes are priced.
- How the final measurement is done.
- Drawings, structural design and approvals: included or separate.
Red flags
- A single lump figure with no area, no specification and no list of exclusions.
- "All inclusive" with no written list of what "all" means.
- Specifications described only as "best quality" or "standard brand".
- Payment demanded well ahead of the work done.
- A rate offered only if you decide immediately, with no validity date.
- Unwillingness to put the area basis, exclusions or price-change terms in writing.
Questions to ask each contractor
- Which drawings and which revision did you price?
- Which area did you measure, and can you show it floor by floor?
- What is not included, and what is your written price for each of those items?
- Which cement, steel and finishes have you priced, with grade and brand?
- Is GST included?
- Is the price fixed? If not, what is the base date and the formula?
- How are payments linked to stages of work?
- Until what date is this price valid?
Frequently asked questions
Should I simply pick the lowest quote?
Only after the four steps. Once area, scope, tax and specification match, the lowest quote may still be the right choice, but often the gap is small and other factors, such as the payment schedule and price-change terms, matter more.
Is a BOQ quote better than a per sq ft quote?
Neither is better in itself. A BOQ shows quantities and item rates, which makes it easier to check, and it suits work that is fully drawn and specified. A per sq ft package is simpler to read but needs a clear area basis, exclusion list and specification sheet to be comparable.
Can I ask a contractor to re-quote on another contractor's format?
Yes. Asking every contractor to quote on the same area, the same scope and the same specification sheet is the easiest way to make quotes comparable.
What if a contractor will not put details in writing?
Treat that as a risk. Anything not written down is hard to check during the work and hard to settle at the end.
How many quotes should I get?
Enough to compare on the same basis. Two or three detailed, comparable quotes are more useful than many one-line rates.
Sources
- Manual for Procurement of Works, Second Edition 2025, Department of Expenditure, Ministry of Finance, Government of India: sections 3.2.1 (lump-sum contract), 3.2.2 (item-rate contract), 3.2.5 para 17(b) (payment milestones), 4.12 (bid validity) and 5.4 (price variation).
- IS 3861:2002, Method of measurement of plinth, carpet and rentable areas of buildings, Bureau of Indian Standards (public copy).
- IS 1200 series, Method of measurement of building and civil engineering works, Bureau of Indian Standards (list of parts).
- IS 269:2015 Ordinary Portland Cement and IS 1489 (Part 1):2015 Portland Pozzolana Cement, Bureau of Indian Standards (BIS list).
- IS 1786:2008 High strength deformed steel bars and wires for concrete reinforcement, BIS product manual.
- BIS products under compulsory certification (Scheme I, ISI mark).
All sources were read on 15 November 2026.
Bring your quotes to us
If you have two or more quotes and want a second pair of eyes on the area basis, exclusions and specification, send them with your drawing through our contact page. The BHK99 team can also give you a quote on the same basis for comparison. For a first estimate, try the construction cost calculator, or see how turnkey homes put design and construction under one contract.