Design & engineering · Structural Design

Foundation Design

Foundation design based on your soil investigation and the actual loads of your building, from isolated footings to rafts and piles where the site calls for them.

Workers fixing column reinforcement and formwork on footings in an excavated siteIllustrative photo

Suited for

  • New homes and commercial buildings
  • Sites with weak or expansive soil
  • Buildings next to existing structures
  • Sheds with heavy column loads

Overview

Foundation Design by BHK99

The foundation is the one part of a building you cannot easily correct later. We start from the soil test report, covering bearing capacity, soil type, depth to firm strata and the water table, and design footings sized for the loads each column carries, including earthquake and wind effects.

Depending on the site, this may mean isolated or combined footings, strip footings, a raft, or piles where the soil is weak. Black cotton soil, found in parts of central India, needs particular care, and we design for its swelling and shrinkage where it is present.

What's included

  • Review of the soil test report
  • Advice on soil testing where none exists
  • Selection of foundation type
  • Footing design for column loads
  • Plinth beam and tie beam design
  • Foundation layout with dimensions and levels
  • Reinforcement details for footings
  • Notes for excavation and site checks

Our approach

What we pay attention to

  • Soil-led design

    Footing sizes and depths come from your soil data, not a standard size used everywhere.

  • Care with expansive soil

    Where black cotton soil is found, depth, plinth protection and drainage are designed for it.

  • Neighbour-aware

    Footings near boundaries or existing buildings are designed to avoid disturbing the adjacent structure.

Step by step

How the work proceeds

  1. 1

    Soil & load study

    Foundation design starts from your soil test where one exists, and from the loads the structure will actually carry — not a generic assumption.

  2. 2

    Structural system decisions

    Framing type, spans and column grid are decided to balance safety with how much steel and concrete the structure actually needs.

  3. 3

    Foundation & frame design

    Footings, columns, beams and slabs are designed and checked against the loads and the soil.

  4. 4

    Reinforcement detailing

    Every column, beam and slab is detailed with exact bar sizes, spacing and bends — what the bar-bender and mason actually follow on site.

  5. 5

    Structural drawings issued for construction

    A complete, numbered drawing set (GFC — good for construction) is handed to the site team.

  6. 6

    Site support during execution

    We stay available to resolve site queries against the structural drawings as work proceeds.

Typical timeline

Indicative durations for a typical residential or small commercial building once the architectural plans are fixed. Larger or unusual structures take longer; the schedule is agreed in writing.

  • Inputs & design basis1–2 weeks
  • Structural scheme1–2 weeks
  • Analysis & design2–3 weeks
  • Detailing & drawings2–4 weeks
  • Site supportongoing

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Foundation Design: common questions

Who arranges the soil test?

You can engage a testing agency directly, or we can suggest the scope and coordinate it. The report then goes into the foundation design.

How deep should my foundation be?

That depends on the soil report, loads and site conditions. The foundation drawing specifies the depth for your building.

Can the foundation allow for a future floor?

Yes. If you plan an additional floor, the foundation is designed for those future loads from the start.