Skip to content

Design & engineering · Structural Design

Steel & Pre-engineered Structure Design

Structural design for steel-framed and pre-engineered buildings: sheds, warehouses, workshops, mezzanines and roof structures.

Red steel roof frame and purlins of an industrial shed seen from belowIllustrative photo

Suited for

  • Warehouses and storage sheds
  • Factory and workshop buildings
  • Agricultural and farm sheds
  • Steel mezzanines and roof structures

Overview

Steel & Pre-engineered Structure Design by BHK99

Steel structures suit large clear spans, quick erection and future extension. We design the frames, purlins, bracing and connections to IS 800 and IS 875, with foundations and anchor bolts designed for the soil and the forces at each column base.

For pre-engineered buildings, we can design the structure ourselves or work alongside a fabricator's design, checking that their frame suits your building's use, loads and foundations, and that all the drawings agree with each other.

What's included

  • Design brief covering spans, heights, loads and crane needs
  • Frame, rafter and column design
  • Purlin, girt and bracing design
  • Connection design and details
  • Anchor bolt and base plate layout
  • Foundation design for column reactions
  • Mezzanine and platform design where needed
  • General arrangement drawings, and fabrication drawings where agreed

Our approach

What we pay attention to

  • Brief first

    Span, eave height, roof slope, crane loads and future expansion are fixed before design begins.

  • Foundations that match the frame

    Anchor bolts and footings are designed for the actual column reactions, including uplift from wind.

  • Fabricator coordination

    Fabrication, foundation and erection work from the same dimensions and the same drawing revisions.

Step by step

How the work proceeds

  1. 1

    Soil & load study

    Foundation design starts from your soil test where one exists, and from the loads the structure will actually carry — not a generic assumption.

  2. 2

    Structural system decisions

    Framing type, spans and column grid are decided to balance safety with how much steel and concrete the structure actually needs.

  3. 3

    Foundation & frame design

    Footings, columns, beams and slabs are designed and checked against the loads and the soil.

  4. 4

    Reinforcement detailing

    Every column, beam and slab is detailed with exact bar sizes, spacing and bends — what the bar-bender and mason actually follow on site.

  5. 5

    Structural drawings issued for construction

    A complete, numbered drawing set (GFC — good for construction) is handed to the site team.

  6. 6

    Site support during execution

    We stay available to resolve site queries against the structural drawings as work proceeds.

Typical timeline

Indicative durations for a typical residential or small commercial building once the architectural plans are fixed. Larger or unusual structures take longer; the schedule is agreed in writing.

  • Inputs & design basis1–2 weeks
  • Structural scheme1–2 weeks
  • Analysis & design2–3 weeks
  • Detailing & drawings2–4 weeks
  • Site supportongoing

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Steel & Pre-engineered Structure Design: common questions

What is a pre-engineered building?

A steel building whose frame is designed and fabricated in a factory for that specific building, then bolted together on site.

Steel or RCC: which suits my shed?

It depends on span, height, use, speed and future plans. We compare both for your brief before recommending one.

Can a steel shed be extended later?

Yes, if the end frames and foundations are planned for extension at the design stage.