Skip to content

Construction · Industrial

Pre-engineered Steel Buildings

Pre-engineered steel buildings for wide, column-free spaces, with foundations, erection and sheeting coordinated by one team.

Red steel roof frame and purlins of an industrial shed seen from belowIllustrative photo

Suited for

  • Factory sheds and workshops
  • Large warehouses
  • Agri processing sheds
  • Buildings that may be extended later

Overview

Pre-engineered Steel Buildings by BHK99

In a pre-engineered building (PEB), the steel frame is designed for your span, height and loads, fabricated off site and bolted together on prepared foundations. It suits large, open buildings such as warehouses, factory sheds and workshops, and on many projects it shortens the time spent on site compared with a full RCC frame.

BHK99 handles the parts that decide whether a PEB performs well: the design brief, the foundations and anchor bolts, coordination with the steel fabricator, erection checks, sheeting, gutters and the floor. Steel sections, coatings and sheeting specifications follow the structural design and the agreed package.

What's included

  • Brief covering span, eave height, loads, cranes and expansion
  • Structural design of the steel frame and foundations
  • Coordination with the steel fabricator and erection team
  • Foundations and anchor bolts set and checked before erection
  • Erection checks for alignment, bolting and bracing
  • Roof and wall sheeting, gutters, ventilators and skylights as specified
  • Industrial floor and as-built drawings at handover

Our approach

What we pay attention to

  • Wide clear spans

    Column-free interiors suit racking, machinery and vehicle movement better than a dense column grid.

  • Anchor bolts right first time

    Bolt positions and levels are checked against the steel drawings before concreting, because errors here delay erection.

  • Planned for expansion

    End frames and foundations can be designed so the building can be extended along its length later.

Step by step

How the work proceeds

  1. 1

    Operational requirement study

    Spans, clear height, floor loads and how material and people will move through the building are studied before the structural system is chosen.

  2. 2

    Structural system selection

    RCC framed or pre-engineered steel — whichever suits your spans, timeline and budget is proposed, with the trade-offs explained.

  3. 3

    Structural & flooring design

    The frame and the floor are designed together for the loads you've described, not a generic default.

  4. 4

    Construction with quality checks

    Steel or RCC work is inspected stage by stage — connections, welds, concrete and reinforcement — before it's covered up.

  5. 5

    Handover with as-built drawings

    You receive drawings that match what was actually built, useful for future maintenance or expansion.

Typical timeline

These durations are indicative for a single-storey industrial building of moderate size. Actual time depends on the span and area, the structural system, approvals, steel fabrication lead times, soil and site conditions, and the specialist systems involved. The schedule is agreed in writing before work starts, and the handover date is always an estimate updated as work proceeds.

  • Requirement study & design3–6 weeks
  • ApprovalsAs per the authority's process
  • Foundations & anchor bolts3–6 weeks
  • Fabrication & erection4–10 weeks
  • Roofing, cladding & floor4–8 weeks
  • Services & handover2–4 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Pre-engineered Steel Buildings: common questions

Is a PEB better than an RCC building?

Neither is better in every case. PEB suits wide spans and quicker site erection; RCC can suit smaller spans, multi-storey use and some exposure conditions. We explain the trade-offs for your project before you decide.

Can a PEB carry a crane?

Yes, if the crane's capacity and position are known at design stage. The frame, crane beams and foundations are designed for those loads.

How is a steel building kept from rusting?

Through the coating system and sheeting specified in the design and package, good drainage of roof water, and periodic inspection and touch-up as part of normal maintenance.