Cold & Dry Storage Buildings

Storage buildings for produce and goods, where BHK99 builds the civil and structural shell and coordinates with the specialist supplier you appoint for refrigeration and insulated systems.

Workers fixing column reinforcement and formwork on footings in an excavated siteIllustrative photo

Suited for

  • Cold stores for fruit, vegetables and dairy
  • Grain and produce storage
  • Packaged-goods storage
  • Producer groups and agri traders

Overview

Cold & Dry Storage Buildings by BHK99

Cold and dry storage buildings protect goods that spoil, so the building has to work with the systems inside it. For a cold store, BHK99 designs and builds the civil and structural shell: foundations, frame, floors, plinths, drainage, machine-room space and the openings and supports the refrigeration system needs. The refrigeration plant, insulated panels and controls are designed and installed by the specialist supplier you appoint, and their requirements are built into our drawings.

Dry storage for grain, produce and packaged goods needs a raised, damp-free floor, good roof drainage, ventilation and protection from pests. We plan these from the goods you store and how long they stay.

What's included

  • Brief covering goods stored, handling and storage period
  • Civil and structural design of the storage shell
  • Coordination with your refrigeration or insulation supplier
  • Floors, plinths and supports to the supplier's requirements
  • Machine-room, drainage and electrical provisions for supplied systems
  • Damp, pest and roof-water protection for dry storage
  • Construction with stage inspections and as-built drawings

Our approach

What we pay attention to

  • Clear division of work

    BHK99 builds the shell; refrigeration and insulated systems are by the specialist you appoint. Responsibilities are written down before work starts.

  • Supplier requirements built in

    Floor levels, panel supports, openings and power points are taken from the supplier's drawings before construction.

  • Dry, raised floors

    Plinth height, damp-proofing and drainage keep moisture away from grain and packaged goods.

Step by step

How the work proceeds

  1. 1

    Operational requirement study

    Spans, clear height, floor loads and how material and people will move through the building are studied before the structural system is chosen.

  2. 2

    Structural system selection

    RCC framed or pre-engineered steel — whichever suits your spans, timeline and budget is proposed, with the trade-offs explained.

  3. 3

    Structural & flooring design

    The frame and the floor are designed together for the loads you've described, not a generic default.

  4. 4

    Construction with quality checks

    Steel or RCC work is inspected stage by stage — connections, welds, concrete and reinforcement — before it's covered up.

  5. 5

    Handover with as-built drawings

    You receive drawings that match what was actually built, useful for future maintenance or expansion.

Typical timeline

These durations are indicative for a single-storey industrial building of moderate size. Actual time depends on the span and area, the structural system, approvals, steel fabrication lead times, soil and site conditions, and the specialist systems involved. The schedule is agreed in writing before work starts, and the handover date is always an estimate updated as work proceeds.

  • Requirement study & design3–6 weeks
  • ApprovalsAs per the authority's process
  • Foundations & anchor bolts3–6 weeks
  • Fabrication & erection4–10 weeks
  • Roofing, cladding & floor4–8 weeks
  • Services & handover2–4 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Cold & Dry Storage Buildings: common questions

Does BHK99 supply the refrigeration system?

No. Refrigeration plant, insulated panels and controls are designed and installed by the specialist supplier you appoint. We build the civil and structural shell to suit their requirements and coordinate with them on site.

Can you work with a supplier we have already chosen?

Yes, and it helps to involve them early. Their layout, loads, floor details and power needs shape the shell design.

How do you keep a dry store free of damp?

With a raised plinth, damp-proofing below the floor, good roof and site drainage, and ventilation planned for the goods stored.