Workshops & Factory Sheds

Workshops and factory sheds planned around your machines, process flow, power and ventilation, so the building supports the work rather than getting in its way.

Worker on a reinforcement grid as concrete is pumped into a raft foundationIllustrative photo

Suited for

  • Fabrication and engineering workshops
  • Small and medium manufacturing units
  • Vehicle service workshops
  • Food and agri processing units

Overview

Workshops & Factory Sheds by BHK99

A factory shed is planned from the process outward. Where raw material comes in, where each machine sits, how finished goods leave, where people walk and where heat, dust or fumes need to escape: these decide the building's shape, height, openings and services.

We coordinate with your machine suppliers on foundation sizes, anchor details and power requirements, and design floors for machine loads and vibration where needed. Ventilation, daylight, drainage and safe circulation are planned with the structure, along with space for future machines.

What's included

  • Process-flow and machine-layout study with your team
  • Structural system selection: RCC, PEB or a combination
  • Machine foundations coordinated with supplier specifications
  • Floor design for machine loads, vibration and traffic
  • Electrical distribution and power-supply planning
  • Ventilation, daylight, drainage and safe walkways
  • Construction with stage inspections and as-built drawings

Our approach

What we pay attention to

  • Built around the process

    The layout follows your material flow, so goods and people move in a clear line rather than criss-crossing.

  • Machine foundations coordinated

    Foundation sizes and anchor details are taken from your machine suppliers' specifications before the floor is cast.

  • Air and light

    Ridge ventilators, louvres and translucent sheets are planned to keep the shed workable in summer.

Step by step

How the work proceeds

  1. 1

    Operational requirement study

    Spans, clear height, floor loads and how material and people will move through the building are studied before the structural system is chosen.

  2. 2

    Structural system selection

    RCC framed or pre-engineered steel — whichever suits your spans, timeline and budget is proposed, with the trade-offs explained.

  3. 3

    Structural & flooring design

    The frame and the floor are designed together for the loads you've described, not a generic default.

  4. 4

    Construction with quality checks

    Steel or RCC work is inspected stage by stage — connections, welds, concrete and reinforcement — before it's covered up.

  5. 5

    Handover with as-built drawings

    You receive drawings that match what was actually built, useful for future maintenance or expansion.

Typical timeline

These durations are indicative for a single-storey industrial building of moderate size. Actual time depends on the span and area, the structural system, approvals, steel fabrication lead times, soil and site conditions, and the specialist systems involved. The schedule is agreed in writing before work starts, and the handover date is always an estimate updated as work proceeds.

  • Requirement study & design3–6 weeks
  • ApprovalsAs per the authority's process
  • Foundations & anchor bolts3–6 weeks
  • Fabrication & erection4–10 weeks
  • Roofing, cladding & floor4–8 weeks
  • Services & handover2–4 weeks

Indicative ranges only. Your schedule is agreed in writing once the design and scope are final.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.

Workshops & Factory Sheds: common questions

Do you design machine foundations?

Yes, from the loads, dimensions and anchor details your machine supplier provides. Heavy or vibrating machines may need foundations separated from the main floor.

Can you plan for machines we will add later?

Yes. Tell us what you expect to add, and we leave space, floor capacity and power routes for it in the design.

Do you handle factory licences?

We prepare the building drawings and support submissions related to the building. Factory, pollution and other operating licences are applied for by the owner, and we provide the drawings they require.