House Construction Stages: What Records to See at Each Step

Published 22 November 2026

Site & quality guide from the BHK99 knowledge centre
Site & quality guide from the BHK99 knowledge centre

Every stage of building a house leaves records: drawings, inspection notes, cube results, delivery bills, photos and measurements. This guide walks through the stages and tells you which records to ask for before you release each payment.

Building a house goes through roughly ten stages, from setting out on the plot to handing over the keys. Each stage leaves records: drawings, inspection notes, test results, delivery bills, dated photos and measurements. If you ask for the right record at each stage, and link each payment to work you can see on paper as well as on site, you will know what was built, how it was checked and what you paid for.

This guide from BHK 99 Real Estate and Constructions lists the stages and the records worth asking for at each one. It does not set payment percentages, because those belong in your agreement; it shows what each payment should be backed by.

Records that run through the whole job

Some records are kept from the first day to the last:

  • The drawing set, with every revision dated, and a note of which revision the site is working from.
  • A site diary: work done each day, people and machines on site, weather, materials received, visitors and any hold-ups. The Government of India's Manual for Procurement of Works suggests keeping progress records, including a register of hold-ups and their reasons, with site photographs.
  • Dated photos of each stage, especially of anything that will be hidden later: foundations, steel, conduits and pipes.
  • Measurements of work done, written down and signed by both sides. The works manual says measurements are taken and signed jointly, and that work should not be covered before it is measured without written consent.
  • Change orders: any change you ask for, with its effect on cost and time agreed in writing before the work is done.
  • A payment register: each payment, the stage it was for and the record that supported it.

Keep all of these in one house file, paper or digital. You will need them for the bank, for future repairs and if you ever sell.

Stage 1: before work starts

  • The building permission and the sanctioned drawings. Our guide to building permission in Madhya Pradesh explains the approval.
  • The signed agreement, specification sheet and payment schedule. See how to compare quotes for what they should say.
  • The structural drawings, and a soil investigation report if your structural engineer asks for one.
  • Notice of start of work to the local authority, where your rules require it. In Madhya Pradesh, the Bhumi Vikas Rules ask the owner to give notice before starting work.

Stage 2: setting out

The house outline is marked on the ground from the drawing.

  • Check the outline against the sanctioned plan: the open spaces at front, back and sides, and the plot boundary. Our guide to how much you can build on your plot explains open spaces.
  • Record: a signed setting-out check and photos of the marked outline with a measuring tape visible.

Stage 3: excavation and foundation

  • The engineer should approve the founding level before any foundation concrete is placed. Ask for that approval in writing, with photos of the open excavation.
  • For reinforced footings: the steel check, cover blocks and pour clearance, as for any concrete pour.
  • Cube samples for structural concrete, recorded in a cube register.
  • Record: engineer's approval of founding level, photos, pour card, cube register entries.

Stage 4: plinth

  • Plinth beam and plinth level checked against the drawing, including the plinth height above the road if your drawing fixes it.
  • In Madhya Pradesh, the rules ask the owner to give notice when the plinth is ready so the building officer can inspect it.
  • Record: plinth level check, plinth notice and any inspection note, photos.

Stage 5: columns, beams and slabs

Every slab, beam and column pour is a hold point. Our slab casting checklist covers this stage in detail.

  • Record for each pour: drawing revision, bar bending schedule, pour card or clearance, cube samples, the curing plan, and the date the shuttering and props came off with the engineer's go-ahead.
  • Delivery records for cement and steel: the standard and grade, the ISI mark, and the date on the cement bags. Cement and reinforcement bars are under compulsory BIS certification.

Stage 6: walls and lintels

  • Bricks or blocks as specified, with delivery bills.
  • Lintel and sill levels as per the drawing, and door and window openings in the right places before plaster.
  • Record: delivery bills, photos, a check of opening sizes against the drawing.

Stage 7: electrical and plumbing before they are covered

  • Conduits, switch boxes, water and drain pipes fixed in walls and floors before plaster and flooring.
  • Ask how the plumber will test the pipes for leaks before they are covered, and keep the result.
  • Record: dated photos of every wall and floor with pipes and conduits, marked with room names. These photos save a lot of trouble when someone later drills a wall.

Stage 8: waterproofing, plaster and flooring

  • Waterproofing in bathrooms, the kitchen and on the terrace before tiles or screed, with the product and the method written down.
  • Ask how each waterproofed area will be tested before it is covered, and keep the result.
  • Plaster and flooring materials and brands as per the specification sheet.
  • Record: product bills, test results, photos before covering.

Stage 9: doors, windows, fittings and painting

  • Doors, windows, sanitaryware, taps, switches and paint as per the specification sheet, with bills.
  • Manufacturer warranty cards and manuals for branded products such as pumps, fittings and appliances, in your name where possible.
  • Record: bills, warranty cards and manuals, and a list of brands and models used.

Stage 10: completion and handover

  • A final walk-through with a written list of defects to be fixed, and a date for fixing them.
  • The final measurement and the final bill, reconciled with the payments already made.
  • As-built drawings showing what was actually built, including the routes of pipes and wiring.
  • In Madhya Pradesh: notice of completion to the authority, and occupancy permission before you move in. The bank may ask for these.
  • Record: the defects list and its sign-off, final account, as-built drawings, completion and occupancy papers.

Link each payment to a record

Whatever your payment schedule, make each payment depend on a stage that is complete and backed by its record. The works manual says payments should match the work actually done and warns against front-loading, which means paying more early than the work justifies.

A simple rule: before each payment, ask to see the record for that stage. If the record is not ready, the stage is not finished.

Common mistakes

  • Keeping records on several phones and losing them by the end.
  • Paying by date instead of by completed stage.
  • Agreeing changes on the phone and arguing about their cost later.
  • No photos of pipes and conduits before plaster.
  • Moving in before completion and occupancy papers are in hand.

Questions to ask your contractor at the start

  • Will you keep a site diary, and can I see it every week?
  • Who measures the work, and will we both sign the measurements?
  • How will cube samples be taken, and where will they be tested?
  • How will changes be agreed and priced before work starts on them?
  • What records will you hand over at completion?

Frequently asked questions

How many stages are there in building a house?

It depends on the design, but most independent houses go through roughly ten: preparation, setting out, excavation and foundation, plinth, frame and slabs, walls, services, waterproofing and finishes, fittings and painting, and handover.

Should I pay by percentage of the total?

Your agreement decides the amounts. What matters is that each payment follows a completed stage and its record, not a calendar date.

Which records are most important?

Those for work that will be hidden: founding level, steel and cover, cube results, and photos of pipes and conduits before plaster.

What should I get at handover?

As-built drawings, the defects list and its sign-off, the final account, manufacturer warranty cards and manuals, and the completion and occupancy papers your local rules require.

Sources

All sources were read on 15 November 2026.

Keep your build on record

If you are about to start building, or you are midway and want to check your records, send your drawings and agreement through our contact page. If you live away from the site, see how remote-owner turnkey projects keep owners informed, or read about our turnkey homes.

Project Enquiry

Tell us about your construction requirements and our team will get in touch.

Our Locations

We serve key locations with a local, on-ground approach.